2022 Reflection 150 226RK, factory solar and Victron energy meter installed.
Would like to move my LiFePO4 batteries to the pass-thru and looking for tips to make this as easy as possible. I think I'm good on the connection to the 12V bus bars and the MPTT controller but not sure on the control wiring for the battery shunt. The current carrying wire go over the top and I see those but the control wiring from the shunt goes down, not sure how to move it to the pass-thru.
Thanks in advance.
Would like to move my LiFePO4 batteries to the pass-thru and looking for tips to make this as easy as possible. I think I'm good on the connection to the 12V bus bars and the MPTT controller but not sure on the control wiring for the battery shunt. The current carrying wire go over the top and I see those but the control wiring from the shunt goes down, not sure how to move it to the pass-thru.
Thanks in advance.
Comment