Our rig is on a permanent site. I plan to have a new deck built later this year and will also build a nice set of wide steps with a landing at the top near the door. I built a smaller set of steps that I designed to go over the existing fold down steps but will not use those after the deck is built.
So how difficult is it to remove the fold down steps?
So how difficult is it to remove the fold down steps?
Comment