Yoda Keith,
The Victron MPPT is installed and held in with industrial Velcro. I'll need to go out in the frozen tundra to plug it into the Imagine to program it. This unit has a jumper installed where I'll need to do a little digging to see if this is really needed. It has to do with the load portion of the controller which is not used.
Victron also recommends that the controller is to be plugged into the battery feed before the panels so I need to better understand if this is needed or to simply shield the panels while plugging the unit into battery power. Curious how this works with rooftop mounted panels with respect to the battery switch.
Jim
The Victron MPPT is installed and held in with industrial Velcro. I'll need to go out in the frozen tundra to plug it into the Imagine to program it. This unit has a jumper installed where I'll need to do a little digging to see if this is really needed. It has to do with the load portion of the controller which is not used.
Victron also recommends that the controller is to be plugged into the battery feed before the panels so I need to better understand if this is needed or to simply shield the panels while plugging the unit into battery power. Curious how this works with rooftop mounted panels with respect to the battery switch.
Jim
Comment